AWS Bedford Water Recycling Centre
Pump Replacement Project Overview The original pumps were selected to for a duty flow of 638.9l/s (2300m3/hr) at a duty head of 22.43m, but as the actual head is about 15m causing the pumps to deliver more than the head works can take. The pumps were also on VSD drives which were controlled from the […]